Pitch in during "Get MARY ready for the public" work

Sanding and painting needed in this executive suite asap.  a false plywood floor has been cut and painted and needs to be installed after other surfaces are painted.

Sanding and painting needed in this executive suite asap.  a false plywood floor has been cut and painted and needs to be installed after other surfaces are painted.

PortSide NewYork is preparing to have the historic ship MARY A. WHALEN be publicly accessible by summer.  She and we will then be accessible for several years in a row, a real breakthrough after 10 years of operating as a pop-up in continual negotiations for short term permits.  We hope you are as excited by this news as we are! 

We could use some help getting ready, especially because the lingering winter weather delayed painting interior spaces on the ship before we moved our offices back aboard on April 30th.

Come enjoy spring weather on the waterfront and lend a hand.  It's fun here! Join us!

To get involved, call 917-414-0565 or email portsidenewyork@gmail.com. More about volunteering in general here.

Ways you can help:

Sanding and painting!  

Finish painting the Captain's cabin. Sand and paint the Assistant Engineer's cabin below (currently the office of our President Carolina Salguero).  Sand and paint the Tankermen's and Chief Engineer's cabin.

Like to pack and schlepp? 

We need to move stuff around on the boat and move stuff off the boat. Things in the Tankermen's cabin go up to Captain's cabin once painting there is finished (it's almost done.) Contents of Chief Engineer's cabin are  being taken off the boat to make space. Some stuff (some small, some heavy) goes into storage in the cargo tanks (that all involves fun with rigging).  Btw, did you know that schlepp comes from the German word for tugboat?  

Enjoy the Upacking and Tidying arts?

Can you organize stuff? Like to clean?

Things have been piling up in main office space (two joined cabins) since the end-of-year Rigging Olympics and especially since we moved out of our shoreside office yesterday. We  need to pack up and archjve some things until we can install better storage and desk system.

this is the fidley after yesterday's move of office from shore to ship. all t his has to get put away and the fidley deck  needs a second coat of paint.

this is the fidley after yesterday's move of office from shore to ship. all t his has to get put away and the fidley deck  needs a second coat of paint.

Good at designing small spaces? 

We seek a new office layout with custom desk surfaces and new storage units for our main shipboard  office space below (two  cabins joined by the previous owners).  We have outgrown our current agglomeration of vintage steel desks and storage units. We have up to four people working in here at a time and much to store. Design needs to take into account that the ship moves.

Crude Woodworking

We need to cut planks to put down a floor in another cargo tank to use it as a storage area.  We need to install temporary plywood floors in two cabins used as office spaces.

Welding

Welding needed to finish sealing up the new hatch over cargo tank P2 which was cut late last year so we could store our large collection of vintage maritime artifacts down below. We have some other small welding repairs on hinges on steel doors etc. We are willing to pay for this work.

Revel in communication?

We could use some help with outreach to volunteers and event partners. This work requires a regular commitment of time over two months.

To get involved, call 917-414-0565 or email portsidenewyork(a)gmail.com.  More about volunteering here.

Thanks!